Site: Beeston Cattle Market Location: Beeston, Cheshire Client: BPA Duration: 11 weeks Nature of Project: Cross bonding CP issues on fuel lines Stage of Works: Site set-up Trial holes by hand carried out to find main Excavation by hand with use of digging skip to a depth of 5m Installation of temporary works with assistance
Site: Setley PRS Pit Lid Upgrade Location: Bolder, Lymington Client: SGN Duration: 2 weeks Nature of Project: Upgrade of Existing Pit Covers Stage of Works: Pre-construction Carr Civil Engineering was awarded the project to remediate damage to existing pit lids Works located in a SSSI area within the New Forest National Park HRA report carried
Site: Hollybush Zinc Ribbon Installation Location: Hollybush Lane, Eversley Client: SGN Duration: 8 weeks Nature of project: Installation of Zinc Ribbon. These works were carried out in an open field adjacent to Hollybush Lane, Eversley, RG27 0NH. We had a meeting on site with the Land Owner, & their Land Agent for the permissions to