Beeston Cattle Market
Site:
Beeston Cattle Market
Location:
Beeston, Cheshire
Client:
BPA
Duration:
11 weeks
Nature of Project:
Cross bonding CP issues on fuel lines
Stage of Works:
- Site set-up
- Trial holes by hand carried out to find main
- Excavation by hand with use of digging skip to a depth of 5m
- Installation of temporary works with assistance of excavator
- Setting out of crossing points to safely cross existing pipelines
- Removal of wrap & pipe clamps, shot blasting & recoating of pipelines
- Reinstallation of pipe clamps
- Acothane paint applied
- Backfilling of excavation & removal of temporary works