Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/revslider/includes/output.class.php on line 3706

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/all-in-one-seo-pack/modules/aioseop_opengraph.php on line 848
Bridge Crossings at Government Road, Aldershot – Carr Civil Engineering

Bridge Crossings at Government Road, Aldershot

Government Road

This was a big clearance on both sides of the canal to install the anti climb measures, with the assistance of an access lorry. The Raptors were fitted to either end of the pipe and secured,  with the extra spikes running all along the remaining pipe. Signage and warning posts were set at either end of the pipe.

Before and after pictures, good job done.

Recent Posts

Remove Broken Paving Slabs at Frensham AGI

5 years ago

Crowthorne Reinstatement Project

5 years ago

Lordswood Pressure Regulation Site (PRS)

5 years ago

Our Projects

Carr Civil Engineering

  • 4 Longham Business Centre, 168 Ringwood Rd, Ferndown Dorset BH22 9BU
  • +44 (0) 1202 578697
  • 8.30am - 4.30pm