4 Longham Business Centre, 168 Ringwood Rd, Ferndown
Sheeted & framed excavation of 5 metres x 5 metres x 4 metres was used to excavate down on to a leaking end seal. Full temporary works design was put into place before any work commenced. Once the end seal and filling points were exposed, the sleeve was then pressurised, and it was found that
Due to a recent heath fire, multiple plumes of dense, thick, acrid smoke rose up into the high voltage overhead power cables, resulting in multiple arc strikes travelling back down through the carbon within the smoke, striking the HP Pipeline parallel to the high voltage overhead cables. After excavations were carried out & the pipeline