Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/revslider/includes/output.class.php on line 3706

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/all-in-one-seo-pack/modules/aioseop_opengraph.php on line 848
Electricity pylons | Carr Civil Engineering

Electricity pylons

PO86 Arc Strike Investigations & Epoxy Shell Installation

June 3, 2019

Due to a recent heath fire,  multiple plumes of  dense, thick, acrid smoke rose up into the high voltage overhead power cables, resulting in multiple arc strikes travelling back down through the carbon within the smoke,  striking the HP Pipeline parallel to the high voltage overhead cables. After excavations were carried out & the pipeline

Read More