Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/revslider/includes/output.class.php on line 3706

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/all-in-one-seo-pack/modules/aioseop_opengraph.php on line 848
Survey | Carr Civil Engineering

Survey

Anode Scheme Draindowns and Readings.

April 15, 2019

Teams are out this week, covering areas South, South East, tracking down Cathodic Protection Posts, making sure that the posts are not missing, or damaged, then by carrying out drain downs this can determine if the C.P is failing. If the post is showing a failed reading, then the anodes that protect the pipes will

Read More