Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/revslider/includes/output.class.php on line 3706
Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/all-in-one-seo-pack/modules/aioseop_opengraph.php on line 848 Pipeline Maintenance | Carr Civil Engineering
4 Longham Business Centre, 168 Ringwood Rd, Ferndown
The team at Carr Civil Engineering have been busy over the last few weeks installing CP Posts in various locations within the UK. These posts protect the pipeline from corrosion. The team of two will hand dig a trench, whether this is in the verge or on the highway (subject to permit) and using traffic