Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/revslider/includes/output.class.php on line 3706
Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/all-in-one-seo-pack/modules/aioseop_opengraph.php on line 848 Pipe Inspection | Carr Civil Engineering
4 Longham Business Centre, 168 Ringwood Rd, Ferndown
All of the team have been working at Crowthorne, on the zinc ribbon installation. The reason for the zinc ribbon installation is to depreciate the AC current on the HP pipeline. We have installed the zinc ribbon parallel to the pipeline on both sides & at pipe depth. Pipeline was exposed at 20 metre intervals,