Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/revslider/includes/output.class.php on line 3706

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/all-in-one-seo-pack/modules/aioseop_opengraph.php on line 848
Excavation | Carr Civil Engineering

Excavation

Installation of Zinc Ribbon & Arc Strike Inspections on HP Pipeline PO86.

July 5, 2019

All of the team have been working at Crowthorne, on the zinc ribbon installation. The reason for the zinc ribbon installation is to depreciate the AC current on the HP pipeline. We have installed the zinc ribbon parallel to the pipeline on both sides & at pipe depth. Pipeline was exposed at 20 metre intervals,

Read More