4 Longham Business Centre, 168 Ringwood Rd, Ferndown
The last few weeks we have been working on a major Project on the Weymouth Way, but in between we have also been installing the anodes and replacing test posts. Here we have a before and after picture of works carried out on the verge, so a notice was issued to the council for their
Teams are out this week, covering areas South, South East, tracking down Cathodic Protection Posts, making sure that the posts are not missing, or damaged, then by carrying out drain downs this can determine if the C.P is failing. If the post is showing a failed reading, then the anodes that protect the pipes will
The team at Carr Civil Engineering have been busy over the last few weeks installing CP Posts in various locations within the UK. These posts protect the pipeline from corrosion. The team of two will hand dig a trench, whether this is in the verge or on the highway (subject to permit) and using traffic