Trench dug out for coupons & half cell.<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"The team at Carr Civil Engineering have been busy over the last few weeks installing CP Posts in various locations within the UK. These posts protect the pipeline from corrosion. The team of two will hand dig a trench, whether this is in the verge or on the highway (subject to permit) and using traffic<\/p>\n","protected":false},"author":1,"featured_media":938,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[17],"tags":[74,69,72,71,73,75,76],"_links":{"self":[{"href":"https:\/\/carrcivilengineering.co.uk\/wp-json\/wp\/v2\/posts\/933"}],"collection":[{"href":"https:\/\/carrcivilengineering.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/carrcivilengineering.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/carrcivilengineering.co.uk\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/carrcivilengineering.co.uk\/wp-json\/wp\/v2\/comments?post=933"}],"version-history":[{"count":6,"href":"https:\/\/carrcivilengineering.co.uk\/wp-json\/wp\/v2\/posts\/933\/revisions"}],"predecessor-version":[{"id":946,"href":"https:\/\/carrcivilengineering.co.uk\/wp-json\/wp\/v2\/posts\/933\/revisions\/946"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/carrcivilengineering.co.uk\/wp-json\/wp\/v2\/media\/938"}],"wp:attachment":[{"href":"https:\/\/carrcivilengineering.co.uk\/wp-json\/wp\/v2\/media?parent=933"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/carrcivilengineering.co.uk\/wp-json\/wp\/v2\/categories?post=933"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/carrcivilengineering.co.uk\/wp-json\/wp\/v2\/tags?post=933"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}