Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/revslider/includes/output.class.php on line 3706

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/all-in-one-seo-pack/modules/aioseop_opengraph.php on line 848

Warning: Cannot modify header information - headers already sent by (output started at /home/carrcivilenginee/public_html/wp-content/plugins/revslider/includes/output.class.php:3706) in /home/carrcivilenginee/public_html/wp-includes/feed-rss2.php on line 8
Zinc Ribbon – Carr Civil Engineering https://carrcivilengineering.co.uk Fri, 26 Feb 2021 12:14:13 +0000 en-US hourly 1 https://wordpress.org/?v=6.2.2 Close down meeting at Crowthorne for the Zinc Ribbon & Arc Strike Project https://carrcivilengineering.co.uk/close-down-meeting-at-crowthorne-for-the-zinc-ribbon-arc-strike-project/ Wed, 02 Oct 2019 11:15:48 +0000 https://carrcivilengineering.co.uk/?p=1137 Following the completion of the Crowthorne Project a close down meeting was held with Natural England the BBOWT Council, Bracknell Council & SGN the client.

All parties were happy with the project and the way it had been reinstated, and we have agreed with our client to cut down some heather & reseed the area as a goodwill gesture to the councils & Natural England for being so accommodating.

Comments from Natural England, Des Sussex – Team Leader

“This sounds very good – many thanks for taking the nature conservation interests of the site into account with your management of the project. I hope the future management plans will help to safeguard the pipeline as well as the habitats”

 

 

]]>
Installation of Zinc Ribbon & Arc Strike Inspections on HP Pipeline PO86. https://carrcivilengineering.co.uk/installation-of-zinc-ribbon-on-high-pressure-gas-pipe/ Fri, 05 Jul 2019 10:25:00 +0000 https://carrcivilengineering.co.uk/?p=1040 All of the team have been working at Crowthorne, on the zinc ribbon installation. The reason for the zinc ribbon installation is to depreciate the AC current on the HP pipeline. We have installed the zinc ribbon parallel to the pipeline on both sides & at pipe depth. Pipeline was exposed at 20 metre intervals, making sure that the pipeline was supported in 3 metre sections. Arc strike inspections were carried out by the client, if there had been any arc strikes present then a P11 assessment would be carried out, the results of this would determine whether this section of pipeline would require blasting and recoating.

The digging methodology used on this project was a stepped battered excavation, hand digging within 1 metre from the side of the pipeline, due to the project being under SW2 permitry.

 

 

]]>