Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/revslider/includes/output.class.php on line 3706

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/all-in-one-seo-pack/modules/aioseop_opengraph.php on line 848

Warning: Cannot modify header information - headers already sent by (output started at /home/carrcivilenginee/public_html/wp-content/plugins/revslider/includes/output.class.php:3706) in /home/carrcivilenginee/public_html/wp-includes/feed-rss2.php on line 8
Nitrogen Sleeves – Carr Civil Engineering https://carrcivilengineering.co.uk Tue, 02 Apr 2019 13:02:29 +0000 en-US hourly 1 https://wordpress.org/?v=6.2.2 Grouting Projects in Macclesfield, Cheshire for Cadent Gas https://carrcivilengineering.co.uk/grouting-projects-in-macclesfield-cheshire-for-cadent-gas/ Tue, 02 Apr 2019 13:02:29 +0000 https://carrcivilengineering.co.uk/?p=947 The team at Carr Civil Engineering have been very busy working in the Manchester & Liverpool area on a project to Grout ten sleeves for Cadent Gas, within protected areas, some of which were located on the Moors.  All equipment was taken to the sites via heavy haulage specialists, with safe off loading of the pump & 150kva generator. Water Tankers were positioned ready on site ready for the grouting procedure to begin. Once the annular space had been filled within the HP pipeline and all completion tests carried out, the lorry was loaded and then the team travelled to the next site.

Picture of the Moors
Setting up the Grout Pump
Weather Protection

 

]]>