Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/revslider/includes/output.class.php on line 3706

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/all-in-one-seo-pack/modules/aioseop_opengraph.php on line 848

Warning: Cannot modify header information - headers already sent by (output started at /home/carrcivilenginee/public_html/wp-content/plugins/revslider/includes/output.class.php:3706) in /home/carrcivilenginee/public_html/wp-includes/feed-rss2.php on line 8
Farnham – Carr Civil Engineering https://carrcivilengineering.co.uk Fri, 26 Feb 2021 11:55:18 +0000 en-US hourly 1 https://wordpress.org/?v=6.2.2 Remove Broken Paving Slabs at Frensham AGI https://carrcivilengineering.co.uk/remove-broken-paving-slabs-at-frensham-agi/ Tue, 21 Jan 2020 11:46:55 +0000 https://carrcivilengineering.co.uk/?p=1178

We were called into carry out works at Frensham AGI, the works consisted of lifting sunken & broken slabs, which were causing a trip hazard for people entering the site compound. We were issued a Form of Authority & Safe Working Procedures were put into place for working on or near buried pressurised pipework, PAMS were used at all times, with suitable PPE.

The works consisted of site set up with barriers, fire extinguishers & breathing apparatus in place. Once the slabs were removed it had been agreed that a concrete base would be laid, the ground was levelled and  hardcore laid, whacked and sealed, with a timber framework constructed, concrete was brought in via wheelbarrow and brush finished.

 

]]>