Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/revslider/includes/output.class.php on line 3706

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/all-in-one-seo-pack/modules/aioseop_opengraph.php on line 848

Warning: Cannot modify header information - headers already sent by (output started at /home/carrcivilenginee/public_html/wp-content/plugins/revslider/includes/output.class.php:3706) in /home/carrcivilenginee/public_html/wp-includes/feed-rss2.php on line 8
excavations – Carr Civil Engineering https://carrcivilengineering.co.uk Fri, 26 Feb 2021 12:08:22 +0000 en-US hourly 1 https://wordpress.org/?v=6.2.2 Nitrogen Sleeve Endseal Repair at Mill Ride, Ascot https://carrcivilengineering.co.uk/nitrogen-sleeve-endseal-repair-at-mill-ride-ascot/ Fri, 09 Aug 2019 09:15:39 +0000 https://carrcivilengineering.co.uk/?p=1104 Sheeted & framed excavation of 5 metres x 5 metres x 4 metres was used to excavate down on to a leaking end seal. Full temporary works design was put into place before any work commenced.

Once the end seal and filling points were exposed, the sleeve was then pressurised,  and it was found that the end seal was offset and not holding pressure. A decision was made by the client that a bespoke end seal was to be manufactured and installed.  Once the endseal was installed the sleeve was then repressurised with nitrogen and is now holding pressure, resulting in the sleeve now being compliant.

 

]]>