Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/revslider/includes/output.class.php on line 3706

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/carrcivilenginee/public_html/wp-content/plugins/all-in-one-seo-pack/modules/aioseop_opengraph.php on line 848

Warning: Cannot modify header information - headers already sent by (output started at /home/carrcivilenginee/public_html/wp-content/plugins/revslider/includes/output.class.php:3706) in /home/carrcivilenginee/public_html/wp-includes/feed-rss2.php on line 8
Concrete Stanchion – Carr Civil Engineering https://carrcivilengineering.co.uk Mon, 14 Oct 2019 09:25:22 +0000 en-US hourly 1 https://wordpress.org/?v=6.2.2 Lordswood Pressure Regulation Site (PRS) https://carrcivilengineering.co.uk/lordswood-pressure-regulation-system-prs/ Tue, 08 Oct 2019 10:00:17 +0000 https://carrcivilengineering.co.uk/?p=1143 Removal of an existing concrete pipe support to accommodate our client, to install a temporary pig trap as part of a ILI (In Line Inspection).

Full health & Safety pack, PPE, Hand and Vibration monitoring, due to use of hand power tools.

A permit to work was put in place by the client.

]]>